ABB
Best Price ABB TB852 Terminator 100% Original
Best Price ABB TB852 Terminator 100% Original
Product Type: Terminator
Payment:T/T, Western Union
Shipping Port:Jinhua China
Lead Time:1-3 Working Days
Condition: Brand New And 100% Original
Warranty: 12 months
The TB852 is an RCU Link Terminator from ABB. It is used to terminate the RCU Link bus in an ABB AC 800M control system. The TB852 has a 9-pin D-sub connector that mates with the RCU Link bus connector on the AC 800M controller. The TB852 also has a built-in 120 ohm resistor that terminates the bus.
The TB852 is a passive device, so it does not require any power to operate. It is simply plugged into the RCU Link bus and the bus is terminated. The TB852 is available in a variety of packaging options, including single units, trays, and kits.
The following are the technical specifications of the TB852:
Connector: 9-pin D-sub
Termination resistance: 120 ohms
Operating voltage: 24 VDC
Operating temperature: -25°C to +70°C
Storage temperature: -40°C to +85°C
Weight: 0.01 kg
ABB NEW ARRIVAL LIST IN STOCK | ||
INNIS21 | IEMMU21 | PMKHRMBRC3000A |
INICT12 | IMFEC12 | PMKHRMBRC3000B |
IMASO11 | IMASI23 | PHARPSFAN03000 |
IMMFP12 | IMDSO14 | PHARPS32200000 |
SPNPM22 | INNPM12 | PHCBRCPBA20000 |
SPBRC410 | IMCPM02 | 6644424A1 |
IMFCS01 | SPDSO14 | IMASO11 |
IMDSI22 | IMDSI22 | INICT12 |
INNPM12 | SPFCS01 | IMFCS01 |
SPEFC12 | IMCPM02 | IEMMU21 |
IMDSO14 | IMMFP12 | IMASI23 |
IMFEC12 | INNIS21 | FI830F |
PM803F | SA811F | YPK114A 3ASD399002B2 |
SA801F | EI813F | REJ603BBB10NN3XC |
FAQ & Contact:
Q: Are you a trading company or a manufacturer?
A: We are a trading company.
Q: What is your lead time?
A: It usually takes one to three days if we have it in stock. If the goods are not in stock, you need to negotiate.
Q: Does your company provide samples? Is it free or do you charge extra?
A: It depends on the goods you need and the quantity you order.
Q: What are your terms of payment?
A: 100% T/T before shipping. If the quantity is large, we can negotiate.
Why Choose Us:
We major in ABB DCS, Foxboro DCS, Honeywell DCS, Westinghouse Ovation DCS, Emerson DeltaV, Bently Nevada, Rockwell Automation, Siemens, Rockwell CPU, Moore APACS, Moore Panel Controllers, Siemens Iskamatic, Schneider PLC, Quantum, Quanten 140CPU, GE Fanuc 90/30, 90/70, Invensys Triconex DCS, FOXBOROI/A MOTOROLA MVME, Siemens and other listed manufacturers.
If you find the same parts from any other suppliers cheaper than us, we will try to match that the same price, or provide you with a further discount.
If you have any further questions, please don't hesitate to contact us.
If you inquiry more than one piece/item, please let us know because we can arrange a discount for you.
More Products In Stock:
GE NEW ARRIVAL LIST IN STOCK | ||
UR8NH | UR9NV | IS200ACLEH1BCB |
UR6CH | URRHV | IS200EPSMG2AED |
UR9GH | URSHB | IS200EROCH1ABC |
UR9EH | UR8LM | IS200ERIOH1ABC |
UR67H | UR8LV | IS200ERDDH1ABB |
UR8FH | UR6LV | IS200DSPXH1DBD |
UR6DH | URRHH | IC752SPL013 |
UR6CH | EX2100 | IS220PPRAH1A |
UR8HH | IC200ALG240 | IS220UCSAH1A |
OVATION NEW ARRIVAL LIST IN STOCK | ||
5X00059G01 | 1C31116G04 | 1C31116G03 |
5X00121G01 | 1C31197G01 | 5X00502G01 |
1C31181G02 | 1C31181G01 | 5X00063G01 |
1C31177G03 | 1C31125G02 | 1C31227G01 |
1C31219G01 | 1C31129G03 | 1C31169G02 |
1C31147G01 | 1C31234G01 | 1C31132G01 |
1C31224G01 | 1C31122G01 | 1C31227G02 |
1C31203G01 | 1C31219G01 | 1C31197G05 |
EPRO NEW ARRIVAL LIST IN STOCK | ||
PR6424/012-000 CON011 | A6110 | MMS6410 |
PR6423/000-131-CN CON031 | A6312 | MMS6110 |
PR6423/002-040 CON041 | A6410 | MMS6220 |
CON021+PR6423/003-130 | A6210 | MMS6210 |
CON021+PR6423/10R-030-CN | A6120 | MMS6250 |
CON021+PR6423/013-000 | A6312/06 | MMS6312 |
CON021+PR6423/10R-030-CN | PR9376/20 | MMS6210 |
CON021+PR6423/10R-030-CN | CON021 | CON041 |
CON041/SF+PR6423/015-111 | CON011 | CON031 |
CON021+PR6423/003-130 |
![Best Price ABB TB852 Terminator 100% Original](http://www.controltech-supply.com/cdn/shop/files/bd14b45e61097e9cfa315f50e9eda75e.jpg?v=1692005126&width=1445)