Skip to product information
1 of 1

Allen-Bradley

Allen-Bradley 2090-SCVP3-0 Sercos Fiber Optic Cable In Stock

Allen-Bradley 2090-SCVP3-0 Sercos Fiber Optic Cable In Stock

Brand: Allen-Bradley
Product Type: Power Supply
Payment:T/T, Western Union
Shipping Port:Jinhua China
Lead Time:1-3 Working Days
Condition: Brand New And 100% Original
Warranty: 12 months

The Allen-Bradley 2090-SCVP3-0 is a Kinetix 6000 Sercos Fiber Optic Cable with a 3 meter length. It is designed to be used in harsh industrial environments and can withstand high temperatures, vibration, and shock. The cable has a PVC over Kevlar jacket and a stainless steel connector on each end.

Features:

  • Sercos fiber optic cable
  • 3 meter length
  • PVC over Kevlar jacket
  • Stainless steel connectors
  • Designed for harsh industrial environments
  • Can withstand high temperatures, vibration, and shock

              FAQ & Contact Information:

              Q: Are you a trading company or a manufacturer? A: We operate as a trading company.

              Q: What is your lead time? A: Our lead time typically ranges from one to three days if the product is currently in stock. If the goods are not in stock, lead time will be subject to negotiation.

              Q: Do you provide samples? Is there a cost associated with them? A: Sample availability and associated costs depend on the specific product and order quantity. Please get in touch with us for detailed information regarding samples.

              Q: What are your payment terms? A: Our standard payment terms require 100% T/T (Telegraphic Transfer) payment before shipping. For larger orders, payment terms can be discussed and negotiated.

              SHIPPING:

              For in-stock items, we aim to ship your order within 3 days of receiving payment.

              We offer worldwide shipping through DHL, UPS, FedEx, TNT, and EMS.

              If you have your own preferred shipping agent, please inform us prior to shipment.

              While we take care to securely package the parts, if you have any specific packaging requirements, please notify us in advance.

              Our usual shipping cutoff time is before 4:30 PM. After shipment, we will promptly provide you with a tracking number. Delivery typically takes 7 to 15 days.

              Upon receiving your package, please notify us via email.

              When inquiring about shipping costs, kindly include the following information:

              • Your zip code.
              • Company name (if applicable) and your name.
              • Your phone number and extension (if applicable).

              Company Services:

              • Fast delivery (1-3 days for in-stock products).
              • Extensive experience (Over 10 years of sales experience).
              • Large inventory (Carrying various brands and maintaining overseas warehouses).
              • Quality assurance (Products come with a clear condition description and a 1-year warranty).

              Contact Us:

              • Phone: +86 18857985841
              • Email: sales@controltech-supply.com
              • Skype: +86 18857985841
              • WhatsApp: 8618857985841
              • Business hours: We provide online support 24/7.

              Address:

              1100 Linjiang East Road, Bailongqiao, Wucheng District, Jinhua City, Zhejiang Province

              More Products In Stock:

              Brand Model
              ABB TP854, CI854A, TC514V2, PM590-ETH, 07AC91, SB821
              HONEYWELL

              900RR0-0300, 900A16-0103, 900R12R-0300,

              51198685-100 SPS5710-2-LF, 51304540-200,

              51198947-100, CC-PAIH02, 05701-A-0325, 05701-A-0327,

              05701-A-0302, 05701-A-0511, 51305418-100

              OVATION 1C31238H01, 1C31161G02, 1C31122G01, 5X00121G01
              YOKOGAWA

              SDV144-S33, SDV541-S33, S9361DH-00,

              AND50-562, 1738-IE4CM12,

              3BHE013940R0002 UNS0868B-P,V2,

              TU830V1, TU830-1, TK821F,

              AAI143-S50, ANT401-5E, AAI543-S03,

              EC401-50, ADV151-P00, AAI543-S50

              GE

              IC200CHS002, IC200MDD842,

              IC200AEPBH1BAA 151X1225EK01PC04,

              369-HI-R-M-0-0

              BENTLY NEVADA

              330190-085-00-05, 133388-01,

              125744-02, 125760-01, 125768-01, 133396-01,

              127610-01, 125840-01, 3500/05-02-04-00-00-00,

              330901-00-16-05-02-CN,

              330901-00-32-05-02-CN,

              330106-05-30-10-02-CN, 330103-00-03-10-01-05

              AB 1756-TBCH1756-N2, 1738-IE4CM12 ,
              80026-044-06-R , 1756-CJC
              Phoenix 2968182
              FOXBORO RH926JM
              EPRO

              CON021+PR6423/10R-030,

              CON021+PR6423/10R-040

              TRICONEX 3805H, 3625
              View full details