Skip to product information
1 of 1

WOODWARD

WOODWARD 9907-004 Master Synchronizer and Load Control (MSLC)

WOODWARD 9907-004 Master Synchronizer and Load Control (MSLC)

Brand: WOODWARD
Product Type: Master Synchronizer and Load Control (MSLC)
Payment:T/T, Western Union
Shipping Port:Jinhua China
Lead Time:1-3 Working Days
Condition: Brand New And 100% Original
Warranty: 12 months

Product Description
The Woodward 9907-004 is a Master Synchronizer and Load Control (MSLC) module designed for three-phase electric power generation sites. It provides comprehensive control and synchronization capabilities, ensuring efficient and reliable operation of power generation systems.

Technical Specifications

  • Model: 9907-004
  • Manufacturer: Woodward
  • Type: Master Synchronizer and Load Control (MSLC)
  • Input Voltage: 120V or 240V AC
  • Control Type: Synchronization, load control, power factor control, process control
  • Communication Protocols: RS485
  • Dimensions: 19 in x 12.244 in x 5.62 in
  • Weight: 14 lbs
  • Certifications: CE, RoHS compliant
  • Application: Three-phase electric power generation, utility load sensor, import/export load level control, power factor control, master process control

FAQ:

Q: Are you a trading company or a manufacturer?

A: We are a trading company.

Q: What is your lead time?

A: It usually takes one to three days if we have it in stock. If the goods are not in stock, you need to negotiate.

Q: Does your company provide samples? Is it free or do you charge extra?

A: It depends on the goods you need and the quantity you order.

Q: What are your terms of payment?

A: 100% T/T before shipping. If the quantity is large, we can negotiate.

SHIPPING:

  1. For the in-stock items, we will ship to you within 3 days after receiving payment.
  2. We can ship all over the world via DHL, UPS, FEDEX, TNT, and EMS.
  3. If you have a shipping agent, please inform us before shipment.
  4. We will pack the parts in a strong box. If you have any special packaging needs, please let us know.
  5. We usually ship by 4:30 PM. After shipment, we will send the tracking number to you. It will take 7~15 days to receive the packages.
  6. When you receive the package, please email us.
  7. Please include all information when asking for shipping costs, or it may delay the process.
      1. What is your zip code?
      1. What is your company name, if you have one, and your name?
      1. What is your phone number and extension, if you have one?

Company Service:

  1. Fast delivery (1-3 days for in-stock products)
  2. Rich experience (Over 10 years of sales experience)
  3. Large inventory (Various brands and overseas warehouses)
  4. Quality assurance (Clear product condition with a 1-year warranty)

Contact Us:

  • Phone: +86 15395923051
  • E-mail: sales@controltech-supply.com
  • Skype: +86 15395923051
  • WhatsApp: 86 15395923051
  • Business hours: We Provide Online Support 24/7
  • Address: 1100 Linjiang East Road, Bailongqiao, Wucheng District, Jinhua City, Zhejiang Province

More Products In Stock:

EMERSON KL3021X1-BA1
KL3022X1-BA1
HONEYWELL TP-DSOEP1-100 51402497-200
TP-OPADP1-200 SPUB5-302
TP-OPADP1-200 51199478-100
TP-OPADP1-200 51305776-100
TP-OPADP1-200 51305557-100
TP-OPADP1-200 51196990-500
TP-OPADP1-200 51305381-500
GE IS220PAICH1B
GE342A4903ADP224L
IS200STAIH2ACB
IS230SNAIH2A
ABB 3BHL001089P0001
SACE PR122/P-LSIG
  DSBC176 3BSE019216R1
GE IS200AEPAH1AFD
IS210BPPCH1AEC
IS200WETAH1AEC IS215WETAH1BB
750-P5-G1-S1-HI-A20-R
YOKOGAWA SAI533-H33/PRP
  2198-D006-ERS3
  2198-D020-ERS3
HONEYWELL 8C-PCNT03
ABB 3BHB006338R0002 UNS0881A-PV2
GE IS200AEPBHIBAA 151X1225EK01PC04
View full details